Nursing Home "Heimetblick" in Biberist, CH. Brügger Architekten AG
I had the pleasure to work on this project since 2018. I got to see the whole design process from the first sketches, down the road to the execution detailing. So, I started as a part of the team at brügger architekten ag, to win the competition, and afterwards, I went through all the design phases including the the project for the construction permit, different levels of cost assessment, detailed design for the open tender, and execution plans. Since March 2021, when I started my own little studio, I am still part of the project, working as a freelance architect for the same team.
To see more details about the design, visit Brügger Architekten AG
Old People’s and Nursing Home Heimetblick, Biberist
Investor: Stiftung Alters- und Pflegeheim Heimetblick, Biberist
Construction: 2021 – 2023